
On the Critical Path
On the Critical Path
orologio On the Critical Path en Altadefinizione. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
- Genere: Documentario
- Nazione: Canada
- Direttore:
- Cast:

Tags: #On the Critical Path 1971 #On the Critical Path Altadefinizione # vedere On the Critical Path online gratis # On the Critical Path film completo hd # On the Critical Path Altadefinizione official # On the Critical Path film streaming # On the Critical Path 123movies # On the Critical Path fmovies # On the Critical Path in italiano #ONF | NFB #nuclear power #candu
Commento
Simile
- 2019

L'atomo: una storia d'amore
L'atomo: una storia d'amore6.42019HD
![L'atomo: una storia d'amore]()
- 2014

Th (Part 11: Dr. Helen Caldicott)
Th (Part 11: Dr. Helen Caldicott)5.12014HD
![Th (Part 11: Dr. Helen Caldicott)]()
- 1971

On Power Refuelling
On Power Refuelling71971HD
![On Power Refuelling]()
- 1969

Douglas Point Nuclear Power Station: Design and Construction
Douglas Point Nuclear Power Station: Design and Construction01969HD
![Douglas Point Nuclear Power Station: Design and Construction]()
- 1963

Nuclear Power Demonstration
Nuclear Power Demonstration01963HD
![Nuclear Power Demonstration]()
- 1973

This Nuclear Age
This Nuclear Age01973HD
![This Nuclear Age]()
- 2026

La Guerre, Donald Trump et nous : 2025, l'année de tous les dangers
La Guerre, Donald Trump et nous : 2025, l'année de tous les dangers7.72026HD
![La Guerre, Donald Trump et nous : 2025, l'année de tous les dangers]()
- 2013

Uranium Drive-In
Uranium Drive-In02013HD
![Uranium Drive-In]()
- 2019

월성
월성02019HD
![월성]()
- 1968

Douglas Point Nuclear Power Station
Douglas Point Nuclear Power Station01968HD
![Douglas Point Nuclear Power Station]()
- 1973

Nuclear Power Reactor - Pickering
Nuclear Power Reactor - Pickering01973HD
![Nuclear Power Reactor - Pickering]()
- 1959

The Atom - Servant of Man
The Atom - Servant of Man81959HD
![The Atom - Servant of Man]()
Registrati




